The work entailed the demolition of seven existing buildings, site preparation for the entire campus, construction of five buildings on the campus site, plus construction of a document destruction facility and steel warehouse at a different location on the base.
The work involved interior metal stud wall framing, installation of gypsum wall board and installation of membrane roof system.
The work entailed construction of a 17,600 square foot, structural steel frame, metal building with continuous footings, slab ongrade, insulated standing beam metal roof system, and fire protection system, including landscape, parking area, oil/water separator and utility connections.
This project entailed the construction of a building, taxiway and apron for the Aerial Measurements Operations Facility.
The project involved the rehabilitation of three barracks.
The project entailed replacement of existing hangar doors with larger overhead hangar doors.
The work scope included a U.S. Army demolition waste area to be recontoured and covered with compacted embankment fill in order to provide a suitable subgrade for an overlaying cover system.
Renovation and rehabilitation of approximately 1,200 housing units, including new roofing, insulation, flooring, wall treatment and other work.
This included the partial demolition of the main building and the total demolition of the old kitchen wing.
This contract involved site work, concrete foundation work, fabrication and installation of four duplex residential modular housing units.
The project consisted of the site development work as a prelude to the eventual construction of expanded facilities for warehousing, cargo facilities, and parking and inspection facilities to process commercial vehicles passing customs.