Restoration of the National Park Inn included the partial demolition of the main building and the total demolition of the old kitchen wing. The main building was then rebuild, including a new foundation, new interior finishes, and a new roof. A new kitchen wing was added along with additional guest rooms, new utilities and new landscaping.
The project involved the rehabilitation of three enlisted men's barracks at Fort Riley, Kansas. The contract required Plano to demolish existing interior partitions, rehabilitate mechanical and electric systems, and construct new masonry partitions, arms vaults, storage rooms, and other features.
This project involved the complete renovation of an existing air force command facility. Work included the removal of all interior partitions, electrical and mechanical systems, layout of new partition, installation of a new electrical mechanical system, construction of elevator tower, and site work.
Construction of new commissary facility and various site improvements.
Renovation and rehabilitation of approximately 1,200 housing units at the Key West Naval Air Station, Key West Florida. Contract work included new roofing, insulation, flooring, wall treatment and other various rehabilitation work.
The work involved interior metal stud wall framing, installation of gypsum wall board and installation of membrane roof system.
The project entailed site work, concrete foundation slab work, construction of warehouse and dock facilities.
This contract involved site work, concrete foundation work, fabrication and installation of four duplex residential modular housing units.
The work entailed construction of a 17,600 square foot, structural steel frame, metal building with continuous footings, slab ongrade, insulated standing beam metal roof system, and fire protection system. Site work included landscape, parking area, oil/water separator and utility connections.
The project involved the construction of a 204,000 spare foot warehouse/office complex.
The project involved the construction of a 360,000 square foot warehouse/office complex.
This project entailed the construction of a 31-unit apartment complex.
Maintenance and office facility staged construction with continuing operations. The project included new office, warehouse, and maintenance facilities, as well as remodel of maintenance and office facilities and all street improvements and paving.
This project was the first phase of a two phase construction program to build a training center for Air Force pilots and navigators. The work entailed the demolition of seven existing buildings, site preparation for the entire campus, construction of five buildings (including three identical dormitories) on the campus site, plus construction of a document destruction facility and steel warehouse at a different location on the base.
The project consisted of the sitework and construction of 25 single family residential housing units.
The project consisted of the construction of 50 single family residential housing units at Unalkleet, Shaktoolik, Koyuk and White Mountain.
The work scope included a U.S. Army demolition waste area to be recontoured and covered with compacted embankment fill in order to provide a suitable subgrade for an overlaying cover system.
The project consisted of the site development work as a prelude to the eventual construction of expanded facilities for warehousing, cargo facilities, and parking and inspection facilities to process commercial vehicles passing customs into the United States.
The project work scope consisted of a new 2-story wood framed structure for administrative and crew quarters, with a 6-bay masonry structure to house fire apparatus.