This project entailed the construction of a building, taxiway and apron for the Aerial Measurements Operations Facility at Nellis Air Force Base, Nevada.
The project entailed the construction of two new airplane hangars and a utility building. The hangars were for the recently-developed Stealth fighter/bomber.
The project entailed replacement of existing hangar doors with larger overhead hangar doors.
Restoration of the National Park Inn included the partial demolition of the main building and the total demolition of the old kitchen wing. The main building was then rebuild, including a new foundation, new interior finishes, and a new roof. A new kitchen wing was added along with additional guest rooms, new utilities and new landscaping.
The project involved the rehabilitation of three enlisted men's barracks at Fort Riley, Kansas. The contract required Plano to demolish existing interior partitions, rehabilitate mechanical and electric systems, and construct new masonry partitions, arms vaults, storage rooms, and other features.
This project involved the complete renovation of an existing air force command facility. Work included the removal of all interior partitions, electrical and mechanical systems, layout of new partition, installation of a new electrical mechanical system, construction of elevator tower, and site work.
Construction of new commissary facility and various site improvements.
Renovation and rehabilitation of approximately 1,200 housing units at the Key West Naval Air Station, Key West Florida. Contract work included new roofing, insulation, flooring, wall treatment and other various rehabilitation work.
The work involved interior metal stud wall framing, installation of gypsum wall board and installation of membrane roof system.
The project entailed site work, concrete foundation slab work, construction of warehouse and dock facilities.
This contract involved site work, concrete foundation work, fabrication and installation of four duplex residential modular housing units.
The work entailed construction of a 17,600 square foot, structural steel frame, metal building with continuous footings, slab ongrade, insulated standing beam metal roof system, and fire protection system. Site work included landscape, parking area, oil/water separator and utility connections.
The project involved the construction of a 204,000 spare foot warehouse/office complex.
The project involved the construction of a 360,000 square foot warehouse/office complex.
This project entailed the construction of a 31-unit apartment complex.
Maintenance and office facility staged construction with continuing operations. The project included new office, warehouse, and maintenance facilities, as well as remodel of maintenance and office facilities and all street improvements and paving.
This project was the first phase of a two phase construction program to build a training center for Air Force pilots and navigators. The work entailed the demolition of seven existing buildings, site preparation for the entire campus, construction of five buildings (including three identical dormitories) on the campus site, plus construction of a document destruction facility and steel warehouse at a different location on the base.
The project consisted of the sitework and construction of 25 single family residential housing units.
The project consisted of the construction of 50 single family residential housing units at Unalkleet, Shaktoolik, Koyuk and White Mountain.
The work scope included a U.S. Army demolition waste area to be recontoured and covered with compacted embankment fill in order to provide a suitable subgrade for an overlaying cover system.
The project consisted of the site development work as a prelude to the eventual construction of expanded facilities for warehousing, cargo facilities, and parking and inspection facilities to process commercial vehicles passing customs into the United States.
The project work scope consisted of a new 2-story wood framed structure for administrative and crew quarters, with a 6-bay masonry structure to house fire apparatus.
Re-roofing of King County Domed Stadium. Project entailed stripping of existing roofing materials, removal (hydro-blasting) of surface and application of a new roofing system.
Construction of a $425,000,000 special purpose baseball stadium adjacent to the King Dome in Seattle, Washington. Project involved EIS, traffic mitigation, site access, railroad air space easements, design coordination, program planning and controls, construction budget analysis, schedule analysis and risk management.
The FPR Project was an approximately $350,000,000 job to construct a nuclear fuel reprocessing facility for the Department of Energy.
The scope included demolition of a portion of an existing building, raising the roof on the portion of an existing building, construction of the dry cell, and building an addition to the existing structure.
The project includes both the renovation and addition of Emerson Elementary.
Construction of a new Middle School in Vancouver, Washington.
Remodel and fifth floor addition to Carpenter Hall at Washington State University. Remodel included new mechanical and electrical systems and utility tunnel.
The contract was for the restoration and renovation of Edens Hall at the campus of Western Washington University.
The scope of work consisted of constructing a new building including the site work.
The project includes both the renovation and addition of Emerson Elementary.